Los Angeles Unified School District Madison Middle School ADA Barrier Removal

 

 

Los Angeles Unified School District Madison Middle School ADA Barrier Removal

Valley Glen, California

The project consisted of extensive alterations to an existing 1,500-student middle school campus consisting of 22 buildings and associated sitework originally constructed in the 1950’s and 60’s. The alterations were designed to remove ADA access barriers and to provide full building and site accessibility throughout the campus.

The project was carefully phased to enable construction to proceed while school was in session. SLO and our team of highly qualified subconsultants worked very closely with the District to help insure that the phasing timelines were met and to help minimize disruption to the students and school staff .

 
 
 

Locker Room

 

Locker Room

 
 
 

ADA Compliant Ramp

 
 
 

ADA Compliant Drinking Fountains

 
 
 

Accessible Gates

 
 
 

Site Plan

  • Accessible Route Upgrades and Barrier Removal

  • Accessible Parking Stalls

  • ADA Compliant Ramps

  • Accessible Gates, Doors, Thresholds, and/or Hardware

  • ADA Restroom Upgrades

  • Reception Counters Modification

  • ADA Compliant Classroom Sink

  • ADA Compliant Drinking Fountains

  • Assembly Seat Modification

  • Gymnasium Locker Room Modification

  • ADA Compliant Signage

 

Education / Los Angeles Unified School District Madison Middle School ADA Barrier Removal

 

Client

Los Angeles Unified School District

Team

JMC2, civil engineer
IMEG Corp., project executive electrical engineer
KPFF, structural engineer

Previous
Previous

Mile Square Park Multi-Sport Facility

Next
Next

Los Angeles Unified School District Normandie Elementary School ADA Barrier Removal